A Fun Look at Economics and the Parabola
Goal: Students will simulate a factory that has the ability to add workers but can not add capital resources. Students will create a product called Nutterflutters in the class. The production process of the product will be analyzed mathematically.
Background information for the teacher: All CTE areas include an element of business and how to be successful in the world of work. In business, seldom are all of your resources unlimited and usually small changes are put into place to increase production (profits). If the marginal benefits (profits) are greater than the marginal (additional) costs, then the change was successful. Some resources such as additional labor can be added (temporary or long term) easily (relatively inexpensive investment) while other resources take planning and substantial ongoing expense. For example, expensive modifications/additions to floor space in a factory or additional production machinery may be cost prohibitive or may require extensive long range planning. We will be looking at The Law of Diminishing Marginal Returns which predicts that labor productivity will eventually fall as you add additional (marginal) workers to the production process, while keeping other resources fixed.
Materials needed: 1 large jar of peanut butter, 1 large jar of marshmallow cream, 1 box of graham crackers, 2 plastic knives, paper plates, and a roll of paper towels.
Time to complete activity: 45 minutes
Process:
1. Let students know that you are going to examine the Law of Diminishing Marginal Returns from economics and how it affects business decisions. Model at a desk/table how to make the Nutterflutter snack (I have heard them called peanut smores, flutternutters, etc). Let them know they will be eating the products at the end of the activity.
2. How to make a snack: Spread out 2 – 4 paper towels on the table. The paper towels represent the work area (factory space) and the work can not be on the bare table (health codes). Break a large graham cracker into fourths (small rectangles). Spread peanut butter on a graham cracker using a knife (must use a knife). Spread marshmallow cream on the other graham cracker using the other knife (must use a knife for “health codes”). Stack the 2 rectangle graham crackers to make a sandwich and then place it on the paper plate (represents your warehouse).
3. Choose a student (or two) to be quality control inspectors. Discuss what is a “good” snack and what would be rejected. Choose another student to be the timekeeper.
4. Select a student to be the worker at the factory. He/she will be making the snacks. He/she is to make as many complete snacks as possible in 1 minute. When the time is up, the inspector(s) will inspect the products to decide if they pass quality control. Count the number of completed snacks that pass inspection and record in the production table. Unacceptable ones are not to be counted. Marginal output is the number of additional products produced because another worker has been added. See the table below for an example of how to calculate marginal output.
Production Table
# workers.....# snacks produced.........................Marginal Output
.......0............................0............................................... N/A
.......1..................3 as an example..............................3 as an example
.......2..................7 as an example............................. 4 as an example
.......3
.......5
.......8
......etc
Your second worker added 4 more Nutterflutters, called the marginal output.
5. Select an additional student to join the already employed student (there are now 2 people on the production line). Remove the previous snacks made and replace with an empty paper plate. Students can not expand the work area (can not add paper towels), or use additional knives….remember the resources are fixed…the only variable is the number of workers. They are to repeat step 4 above by adding another worker.
6. Continue adding workers, being sure not to increase work area (paper towels represent the floor of the factory) and do not increase the number of knives or supplies. Continue adding students until the marginal output begins to drop or perhaps even go negative.
7. Graph the number of workers and marginal output. This should approximate a parabola. If your data is poor, be ready to adjust as needed. Extensions include writing the equation of a parabola, predicting using your equation, and general terminology.
8. Questions: How did specialization/division of labor/assembly line affect the production? Were the additional workers lazy? In this example, when would the factory hire and when would they quit hiring?
This activity has been around for a long time….done differently with different products produced. So, if you have done something similar, I do not want you to think I am taking credit for the creation of this activity. It is a lot of fun, and gives a real life example of the use of quadratics.
Saturday, September 10, 2011
Sunday, March 20, 2011
Fascia Board Angles

The fascia board is a vertical board along the edge of the roof. It is designed as a way of enclosing the end of the rafters of a home. The white board in the photo is a fascia board. Because it is used as a trim/decorative board, the cuts and joints must be precise. The angle (located in the red circle) can be a tough angle to calculate. Many carpenters do not calculate this angle, but instead have it memorized for different roof pitches or use a t-bevel. A t-bevel is a tool that copies angles.
Please calculate the cut angle of the fascia for a 4/12, 5/12, 6/12 pitch roof. What degree measure does the cross cut miter saw need to be set at for your calculated angle? What is the cut at the peak of the roof for the same fascia board? Please show all drawings and calculations.
Saturday, February 12, 2011
Is Your Can Efficient?

In recent years the size and shape of drink cans have been varied. The traditional looking pop can is no longer the only option in purchasing your 12 oz (355 ml) soda. Half size pops, Monster drinks, coffee drinks, etc have filled the grocery shelves.
Your task is to design a cylindrical can (355 ml) that minimizes can production costs. The production costs can be minimized by using the smallest amount of material possible. When cans are manufactured, any material that does not get used in the can will be shredded and recycled. What should the dimensions of the new can be? Hint: 1 mL = 1 cm3
This problem lends itself to using a spreadsheet and graph from the spreadsheet. Please show work/formulas used in the spreadsheet as well as a graph.
Sunday, January 9, 2011
High School Mini Zoo Design

The high school plans to allow the Biology class to build a mini-zoo for small animals such as mice, hamsters, snakes, tarantulas, guinea pigs, etc. Due to budget limitations, costs will be a big concern and design economies must be considered. The cages will be built using 4 ft by 8 ft plywood sheets and 4 ft by 8 ft Plexiglas sheets as the materials. Eight cages will be built. Each cage needs to have a minimum of 360 square inches of floor space. Each cage will be 15 inches tall and one face (side) will have a window for viewing. The window must be at least 10 inches wide.
Your job is to design the “best” mini-zoo. Your solution should include scale drawings of the cages and a written description of the advantages of your zoo design. A material list of will need to be included telling how many sheets of Plexiglas and how many sheets of plywood. Show a cut diagram for how you plan to cut each sheet so that you have all of the pieces needed to construct the zoo cages. Show all math sub-problems used to verify that your solution meets the requirements of the mini zoo.
Tuesday, November 16, 2010
Stair Design

Stairs are a challenge to design. The outdoor deck shown is 11 feet 4 inches above the concrete base ( 4 feet by 4 feet by 4 inches deep). The treads are 11 inches wide. The building code states the stairs are to be at most 30 degrees with the ground and the riser height should be between 6 inches and 8 inches. The rise must be the same for all steps. Note that building codes vary by region.
Please find the following.
1. The length of the 2 by 12 used for the stringer. Remember lumber typically comes in increments of 2 feet. Show the design (rise and run) of the stair designed. Include mathematics to show that the stairs are meeting the code of 30 degrees.
2. Where you would place the concrete base so that the stairs rest on the base and at least 3 feet is showing in front of the stairs.
3. Calculate the number of cubic yards of concrete needed for the concrete base.
4. Present at least 2 possible solutions. Explain what the advantages are to each of your 2 solutions.
Sunday, March 7, 2010
Concrete Slump Test March 2010

Concrete Slump Test
Testing Concrete for Strength
Water Amount_________ (Given by the teacher)
The concrete slump test is, in essence, a method of quality control. For a particular mix being used on a construction site, the slump should be consistent. A change in slump height would demonstrate an undesired change in the ratio of the concrete ingredients. If this were to happen, the proportions of the ingredients would be adjusted to keep a concrete batch consistent. This homogeneity improves the quality and structural integrity of the cured concrete. Too much or too little water will weaken the concrete.
Goal: You will be measuring how much “slump” or sag there is in your concrete mix.
Materials Needed per pair: 1 ruler, 1 cup (18 oz)with the bottom cut out, 1 mixing bucket, 1 baggy of 2.5 lbs concrete, 1 scrap piece of OSB approximately 1 foot square, 1 graduated cylinder, and 1 stir stick.
Procedure Per Pair of Students:
1. Take your premeasured ready mix concrete that you received in the food storage baggy and pour it into the mixing bucket provided.
2. Add water to the concrete mix that is in the mixing bucket. Be sure to measure the water amount carefully. This measure is in milliliters. If your water measurement is off slightly, your results will suffer, and thus your grade.
3. Use stir stick and stir the concrete for 3 minutes or until dry spots of concrete are gone.
4. Measure, in inches to the nearest eighth inch, the vertical height of the cup and record. This height is the perpendicular height of the cup. This is the initial height of the concrete needed for #10 below.
5. Pour half the mix into the upside down cup (with the bottom cut out). Be sure cup is on the scrap piece of OSB. Tamp down the concrete by using stir stick to tamp it 25 times. Add the rest of the mix and tamp. Remember to keep the cup full to the top.
6. Scrap off excess concrete that is above the top of the cup.
7. Remove the “form” AKA cup from around the concrete carefully by lifting the cup straight up.
8. After the concrete stabilizes (stops slumping) measure the height of the concrete. The concrete will have various heights so you will need to measure the average height.
9. Find the amount of slump by taking the initial height – the ending height.
10. Record: (amount of water________ , amount of slump_______)
11. Find the average slump of all pairs of students with the same water amount in the class.
Record Average (amount of water________ , amount of slump_________)
12. Collect data from all the groups in class and record in data table below.
Water 110 120 130 140 150
Slump
13. Label the axis appropriately and graph the data on your own graph paper.
14. Write an equation for the line of best fit.
15.Explain the real life meaning of slope.
16. What type of predictions could you make from your equation
17. If you had a 60 lb bag of concrete, how much water would you need to add to give the same ratio of water to concrete mix as you initially had? Hint: You will not need your graph for this.
18. Take your cement to the designated disposal area/person. Wash all of the equipment and return equipment to teacher.
Teacher Instructions:
It is best if you pre bag the ready mix concrete. Bag 2.5 lbs in each bag. Water must be added using milliliters in the amounts of 110 ml, 120 ml, 130 ml, 140 ml, and 150 ml. Each pair of students will do one water amount or one slump test. To clarify, each pair of students will do one water amount (either 110, 120, 130, 140, 150 ml) Repeat the water amounts as needed depending on the number of groups you have.
We do one slump test per pair of students with at least 2 pairs doing each water amount. A 60 lb bag of ready mix will provide about 24 bags of concrete.
The line of best fit will predict the amount of slump per ml of water. Realize that this equation will only be useful for a specific domain. That is, a concrete mix with too little or too much water will not be a mix. The equation gives you an opportunity to discuss the concept of domain of a function. The slump test is one measure of a concrete’s strength. Once again too much or too little water will significantly weaken the concrete.
Make stepping stones with the left over experiments.
Monday, February 8, 2010
Shopping Carts February 2010

Mathematics appears in unusual places. When grocery stores are designed, an architect must calculate the space needed for storage of the shopping carts. The cart above is 39” long, 22” wide and has a nesting distance of 13.5”. Nesting distance is how much extra length a cart takes when the carts are stacked together. One cart takes up a 39” length and 2 carts take up 52.5” length. Write a length formula that would compute how much length to allow for storing the carts. Assume that there are 5 rows (nests) of carts.
Subscribe to:
Posts (Atom)